Connecting BMS with third-party DCIM system for improved efficiency
Success Stories Corner
Have a sustainability or efficiency problem? Learn how Schneider Electric is using an ecosystem approach around EcoStruxure to solve customer problems.
Auto-suggest helps you quickly narrow down your search results by suggesting possible matches as you type.
Showing results for
Show only
|
Search instead for
Did you mean:
Invite a Co-worker
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Link copied. Please paste this link to share this article on your social media post.
2021-05-2003:37 PM
Connecting BMS with third-party DCIM system for improved efficiency
Originally published on Success Stories Corner by mike_meirovitz | May 21, 2021 12:37 AM
Our Technology Partner
Our EcoXpert Partner
Customer challenge
When the system integrator decided to use a 3rd party DCIM system, he needed to find a scalable solution to allow sharing between EcoStruxure™ Building Operation and the DCIM system.
The solution
The datacenter had previously been equipped with EcoStruxure’s building management solution: EcoStruxure™ Building Operation (EBO), so the system integrator was able to leverage the Smart Connector framework to make the third-party DCIM system interface seamlessly with EBO using OPC Protocol.
The server the SI chose was Control See’s OPC Server for Building Operations. It was configured to receive EBO values in real-time into their DCIM system.
The OPC server for Building Operations discovers all EBO and connected controllers' points and allows any 3rd party OPC UA or DA client software to browse and select any point that is required by the 3rd party system. EBO Values are pushed to the OPC client software on change. This guarantees high performance of the OPC server and the EBO system.
Customer benefits
By using Control See’s pre-validated EBO-OPC Server for Building Operations – which utilizes Schneider Electric’s SmartConnector System – both the datacenter and the system integrator benefited from:
A fast engineering & implementation phase
A reliable interface between EBO and any OPC-enabled system.
A scalable solution means to easily connect hundreds of EBO values into the DCIM system.
Testimonial
“Works as a charm!"– Chris Leijtens, Sr. System & Architecture Engineer - Europe Operations, Schneider Electric, Netherlands