Invite a Co-worker
Send a co-worker an invite to the Exchange portal.Just enter their email address and we’ll connect them to register. After joining, they will belong to the same company.
Send Invite Cancel
80576members
346465posts

New APC BackUPS RS 800 : Another issue : Overload ...

jean019_apc
Crewman
Crewman
0 Likes
0
57

New APC BackUPS RS 800 : Another issue : Overload ...

This was originally posted on APC forums on 8/16/2010


Hi,
I got a first issue with an RS800 unit (defective data port) (2010/03) :
http://forums.apc.com/spaces/4/back-ups-surge-protectors/forums/general/1909/apc-back-ups-xs-1500-po...

I received a new unit (2010/04), and now 3 month later I have another issue :
Each time I power on the RS800, the Green light "On line" flashing during 3sec, then quickly the Battery one (very quickly), then the Red Overload led lights continuously !

I don't undertand because I just come back from vacation, the RS800 was disconnected from the the wall during 2 weeks, and now, when I turn it on, even with nothing connected on it, it tells me "Overload" (until now, it was about 30% usage only).
I disconnected the battery, just for testing, but nothing change.

What's the issue with it ?
(2 issues with 2 different units RS800 ... I wonder about building quality ...)
Thanks

Message was edited by: jean019