Invite a Co-worker
Send a co-worker an invite to the Exchange portal.Just enter their email address and we’ll connect them to register. After joining, they will belong to the same company.
Send Invite Cancel
80616members
346561posts

Overriding Powerchute scheduled on

BillP
Administrator Administrator
Administrator
0 Likes
0
79

Overriding Powerchute scheduled on

This question was originally posted by Andrew on APC forums on 1/28/2012


I have Powerchute set to shut down my server in the evening, then turn back on again in the morning.
Works a treat, problem is that sometimes I want to manually turn the server on in the morning before it is due to be turned on by Powerchute.
Any idea? I've tried pushing and holding the power button on the UPS, been through all the menus, but I can't find anything.
Is there a way to override the power on?